About Sewell’s Marina
Annual Moorage: January 1st – December 31st Seasonal Moorage: April 1st – October 31st Parking privileges are included for one vehicle and are non-transferable. Shore Power is a flat rate of $25/month based on 300kwh, additional power will be billed at a cost-recovery basis on the recorded electrical draw. Shore power can be prepaid for a discounted rate of $250 – Annual or $150 – Seasonal (up to 300kwh monthly)


Facilities
COORDINATES
49.37471 N, -123.27319 E
Port Information
Telephone
Berth Sizes
< 10m, 10-20m
Depth at MLW
2 - 3m
Manoeuvrability
Fair
Channel Marking
Fair
Overseas Visitor Berths
Yes
Dock Type
Floating
Style Side To
Yes
Style Stern To
Yes
Tidal Flow
Negligible
Active Winter
Yes
Weather Forecast
Mon
5AM - 9AM
08 June 2026
- SE 2–9 knots veering S 2-9 knots.
- 12°C
- Mostly fine
Mon
9AM - 1PM
08 June 2026
- SE 6 knots decreasing to SW 2 knots.
- 12 to 15°C
- Calm sea
- UV Index: 4 - Moderate
- Cloudy
Mon
1PM - 5PM
08 June 2026
- Light and variable.
- 11 to 14°C
- Calm sea
- UV Index: 2 - Low
- Cloudy